Skip to content
HOME
ABOUT US
SERVICES
PROJECTS
Highways / Expressways
Flyovers/ ROB’s/ River Bridges/ Metro Rail
Buildings (Residential/ commercial/ Public)
CAREER
CLIENTS
CONTACT US
Detailed Structural Design
Home
»
BRIDGES/ FLYOVERS/ ROBS/ METRO RAIL
»
Detailed Structured Design
River Bridge cum Flyover at Jilani Complex, Surat.
Scope of Work:-
DPR & Detailed Design.
Client :
– Surat Municipal Corporation
Salient Features
:-
Total Length :- 2100 m (4 Lane)
Length of Maximum Span :- 50 m
Total Cost :- Rs. 190.8 Cr.
Type of Superstructure :- Precast PSC I Girder 50m Span & Cast-in-situ PSC Voided slab in Flyover portion.
Remark:
– This project involves Double Decker Bridge in Flyover portion.
ROB at Kopri (Railway Portion) along Eastern Express Highway, Thane (8 Lane ROB)
Scope of Work:
– DPR & Detailed Design for Railway Span
Client:
– Mumbai Metropolitan Region Development Authority (MMRDA)
Salient Features :
–
Total Length :- 785 m
Length of Maximum Span :- 63m,
Total Cost :- Rs. 150 Cr.
Type of Superstructure :- composite steel girders
Remark:
– This is 8 lane ROB on Eastern Express Highway having very heavy traffic volume.
Flyover at Mahavir Chowk, Aurangabad.
Scope of Work:
–
Detailed Structural Design
Client:
– Shri Satya Saibaba Construction
Salient Features
:-
Total Length :- 655 m
Length of Maximum Span :- 50m,
Total Cost :- Rs. 31.65 Cr.
Type of Superstructure :-
Cast-in-situ PSC Box Girder in obligatory span &
Pre-cast PSC I-girder in remaining span
OTHER PROJECTS
Flyover at the junction of Veer Savarkar Bridge and S. V. Road Goregaon-Mumbai. (Steel Superstructure)
Flyover at the junction of N. S. Phadke Marg and Telli Galli, Andheri –Mumbai. (Steel Superstructure)
Flyover at Mahavir Chowk, Aurangabad. (4 Lane Flyover with 50m obligatory span)
Pune Metro between Civil Court to Ramwadi, Pune (Special Span – Steel Superstrucutre)
Patri Pool ROB, Katai Naka ROB & Palava Flyover on Shilphata to Bhiwandi Road, Kalyan-Thane.
(Steel Superstructure – 76.67m Span N-Type Truss)
Widening and Reconstruction of ROB along GMLR near Nahur Railway Station, Mumbai.
(Steel Superstructure – 72.0m Span Girder)
ROB at Vikroli Railway Station, Vikroli – Mumbai.
Railway Bridges (3 Nos.) in Formation for 2 X 300 MW Butibori TPP, Nagpur.
ROB at Milan Subway across Western Railway Line, Mumbai.
Civil Court to Ramwadi, Elevated Corridor II of Pune Metro, Pune.
Grade Separator at Baka-wolf Chowk (Old NH-4), Pimpri Pune.